A barge and a fishing boat on the river at Phnom Penh at dusk, Cambodia

Origins / Cambodia


Shipping from
Cambodia to the US.

Shipping from Cambodia with our own team in Phnom Penh, planning every relay to the US.


Cambodia

Cambodia has grown into a serious source of apparel, travel goods, footwear, bicycles and furniture. There is no direct ship to the US, so the relay is the whole game: plan it well and the extra leg costs very little.

Our Phnom Penh team manages orders, suppliers, bookings and consolidation at the source. Most US cargo moves by barge or truck from Phnom Penh to Cai Mep in Vietnam to meet the mainline vessel, and our team works to its cut-offs.

Many factories are foreign-owned and use imported fabric and components, so origin evidence matters. We help you keep bills of materials and supplier records together, and every PO, container and SKU shows in OWL Vision from PO issuance to final delivery.

At a glance

Cambodia at a glance.

[01] Our office
Phnom Penh
[02] Local time
--:--
12 hours ahead of New York and 15 ahead of Los Angeles on US standard time. One hour less while US daylight saving time is on.
[03] Main seaports
Phnom Penh (river) · Sihanoukville (deep-sea)
No direct US sailings. Phnom Penh cargo barges or trucks to Cai Mep in Vietnam; Sihanoukville cargo relays via Singapore or China.
[04] Main air gateway
Techo International (KTI)
Replaced Phnom Penh International (PNH) in September 2025.
[05] Currency
Cambodian riel (KHR)
The US dollar is used widely for business and wages.
[06] Business language
Khmer
English is common in business, and Chinese in many factories.
[07] US goods imports, 2025
$15.3 billion
US Census Bureau.

Transit times

How long it takes.

Indicative port-to-port days, including the relay. Phnom Penh cargo usually connects with the mainline vessel at Cai Mep in Vietnam; Sihanoukville cargo via Singapore or Chinese ports.

  1. Phnom Penh Los Angeles / Long Beach Via Cai Mep

    22–34 days

  2. Phnom Penh New York Via Cai Mep

    38–48 days

  3. Sihanoukville Los Angeles / Long Beach Via Singapore or China

    35–43 days

Indicative port-to-port ranges from published carrier schedules. They shift with the season, the carrier and congestion, so ask us for current sailings on your lane.

What it makes

Apparel, travel goods, footwear and more.

Most export factories sit around Phnom Penh, in the special economic zones near the Vietnam border and around Sihanoukville.

  • [01] Phnom Penh

    Apparel

    Knit and woven garments from factories in and around Phnom Penh, Kandal and Kampong Speu.

  • [02] Phnom Penh

    Travel goods and handbags

    Luggage, bags and handbags, one of Cambodia’s biggest lines to the US, made around the capital.

  • [03] Phnom Penh · Bavet

    Footwear

    Footwear from the Phnom Penh area and the special economic zones at Bavet, near the Vietnam border.

  • [04] Bavet

    Bicycles

    Bicycles and light manufacturing in the Svay Rieng and Bavet zones, a short truck run from Ho Chi Minh City’s ports.

  • [05] Sihanoukville

    Tires and rubber

    Tires and rubber products from the Sihanoukville special economic zone.

  • [06] Sihanoukville

    Furniture

    Furniture and luggage from the Sihanoukville special economic zone, alongside garments.

Know before you ship

What to plan for.

The rules and rhythms that catch importers out. Rates and rules change fast, so check the latest before you commit.

  • [01] Routing

    Every box transships

    There are no direct US sailings from Cambodian ports, so feeder schedules and cut-offs drive the timeline, and a missed connection usually costs about a week. The ISF is due 24 hours before loading on the mainline vessel at the hub.

  • [02] Air

    A new airport

    Techo International (KTI) replaced Phnom Penh International (PNH) for commercial flights in September 2025. Update your booking data and routing guides.

  • [03] Preferences

    No GSP, no EU benefit

    US GSP, which once covered many Cambodian travel goods, lapsed at the end of 2020 and has not been renewed. The EU’s Everything But Arms scheme only applies to exports to Europe.

  • [04] Origin

    Origin and forced-labor checks

    Many factories use Chinese fabric, components and rubber. US Customs looks at substantial transformation and Xinjiang-linked inputs, so keep sourcing records for apparel and travel goods.

Colleagues discussing a document at a desk in front of a glass wall of sticky notes

Our team in Cambodia

Phnom Penh, wired to Vietnam.

Our Phnom Penh team follows up with suppliers, tracks production and books the barge or truck to Vietnam and the mainline vessel beyond it. They work closely with our Ho Chi Minh City team, so the handover at Cai Mep is one conversation, not two.

  • PO management
  • Supplier follow-up
  • Consolidation
  • Relay planning

Plan around the holidays

When Cambodia stops.

Khmer New Year in mid-April, Pchum Ben in September or October and the Water Festival around November are the big three, and workers often travel home for longer than the official days. Our factory closure calendar has the dates for the next ten years, with book-by dates.

FAQ

Shipping from Cambodia, answered.

[01]How long does it take to ship from Cambodia to the US?

Cargo from Phnom Penh usually connects with a mainline vessel at Cai Mep in Vietnam. It typically reaches Los Angeles or Long Beach in about three to five weeks port to port, and New York in about five and a half to seven weeks. Sihanoukville cargo relays via Singapore or other hubs and typically takes five to six weeks to the West Coast.

[02]Is there a direct ship from Cambodia to the US?

No regular transpacific service calls at Cambodian ports, so US-bound containers transship at a hub such as Cai Mep, Singapore or a Chinese port. Good feeder planning keeps that relay from adding unnecessary days.

[03]Which airport handles air cargo in Phnom Penh?

Techo International Airport (KTI) replaced Phnom Penh International (PNH) in September 2025. There are no direct freighters to the US, so air cargo connects through regional hubs such as Hong Kong, Singapore, Seoul or Bangkok.

[04]Do Cambodia’s EU trade preferences help with US imports?

No. The EU’s Everything But Arms scheme only applies to exports to the EU. US GSP, which once covered many Cambodian travel goods, lapsed at the end of 2020, so US imports pay normal duties.

[05]When do Cambodian factories close?

The biggest closures are Khmer New Year in mid-April, Pchum Ben in September or October and the Water Festival around November. Many workers travel home, so production often stops for longer than the official holidays. Chinese-owned factories may also close for Chinese New Year.

Gray shipping containers stacked two high on a city street

OWL Vision

See every PO before it sails.

From the purchase order in Cambodia to your door: every container, PO and SKU on one live picture, with alerts before a delay reaches you.